Sponsored Content

3 Ways To Begin Taking Advantage Of Off-Site Construction

Courtesy: Clark Pacific
The 318-Unit Village At Santa Monica Contains 52K Sf Of Glass Fiber Reinforced Concrete, Prefabricated By Clark Pacific.

The current construction model is far from perfect, as less than one-third of projects are completed on time and on budget. Despite construction representing a $529B market and the country’s ninth-most-profitable industry, it has not experienced the same caliber of disruptive innovation as other CRE sectors. The industry seems resistant to tech-oriented solutions, as fewer than half of construction projects allocate more than 2% of their budgets to information technology.

Project managers’ top three priorities when shopping for new software are reliability, ease of use and ease of integration, and this extends to their adoption of any new system, according to The Access Group. But widely applicable, one-size-fits-all fixes are rare in construction, due to the specificity of sites and project requirements. One system that is readily adaptable and applicable to any project is prefabrication. Prefabrication is the process of manufacturing sections or systems of a building off-site and transporting them to the construction site for assembly.

Prefabrication carries a number of benefits, including budget and schedule certainty, higher quality, reduced site impacts, reliability, less waste and safer sites. Prefabricated concrete, for example, is gaining recognition for its uses for architectural and structural applications in a number of asset classes, from high-rise multifamily residential to Class-A office buildings.

Owners, especially owner-occupiers, are increasingly expecting a design and construction process that is efficient, productive and cost-effective to a degree that traditional construction methods cannot deliver. These are the top three ways owners and developers can harness the benefits of prefabrication.

1. Ask For It

It may sound simple, but many stakeholders fail to ask about the potential advantages and possibilities of prefabrication at a project’s inception. Requesting a prefabrication strategy from the design team in the project’s planning stages can significantly contribute to its overall success.

Courtesy: Clark Pacific
The 82K SF Roseville City Hall Annex was built with Clark Pacific's Precast Hybrid Moment Frame

2. Modify The Request For Proposals/Procurement Process

A client that values speed of construction to limit disruption to campus operations must make these priorities clear in its RFP. The RFP should telegraph openness to innovative, nontraditional means to reduce project duration.

According to Clark Pacific, off-site construction reports 30% to 50% shorter project completion times compared to conventional construction methods, as building construction occurs simultaneously with the site and foundation work. Prefabrication declutters sites, requiring less equipment and manpower on-site. It also limits the waste, noise and pollution generated by construction activity.

3. Call A Manufacturer

Many prefabricated building companies, like Clark Pacific, have teams of designers and engineers with deep experience designing projects that fully leverage prefabrication. Labor shortages are plaguing the construction industry, with 60% of contractors experiencing difficulty hiring a sufficient number of skilled employees in this year's third quarter. Prefabrication can resolve this issue and numerous others.

To learn more about this Bisnow content sponsor, click here.

Continue reading this story with a free account

Log in or register
Related Topics: Clark Pacific

More About Our Sponsor

| Clark Pacific

Clark Pacific designs, manufactures and builds prefabricated building systems; bridging the gap between construction and manufacturing. Through our design and engineering driven innovation, we offer integrated delivery approaches to deliver high performing and cost effective buildings.Visit www.clarkpacific.com for more information.

Sign up for more articles like this
Subscribe to Bisnow's San Jose Newsletters
Related Stories

Google Delays Thompson Center Opening To 2028, Releases New Renderings

Sovereign Fund Backs £500M Subterranean West End Development

Historic Brooklyn Hotel To Be Turned Into Ritz-Carlton-Branded Condos

Philly Has The Fundamentals. Now It Has To Reduce The Risk Of Building

Design Plans Revealed For RFK Stadium Parking Garages, Headed To Review

SpaceX Sues Texas AG, Grimes County Over Terafab Project Information

Retail Dynasty Pushes Button On Pair Of London Coliving Schemes

1,300 Projects Potentially Paused Due To Suspension Of Quality Inspectors

EXCLUSIVE: Georgia-Pacific Scraps Conversion Plans For Its Atlanta HQ

Miami Is 'Desperate' For A New Office Tower. It's About To Get 2

Sea Wall Rehabilitation: Strengthening Hudson River Walkway For Next 100 Years

Feds Raid North Texas-Based Contractor As Part Of HUD Investigation