Helmut Jahn-Designed Tower May Lose Supertall Status

One of several downtown supertall projects proposed in this cycle is losing supertall status thanks to a height reduction.

The Helmut Jahn-designed tower set for 1000 S Michigan Ave could be cut from its original proposed 1,001-foot height to 823 feet, well below the 984-foot minimum required for designation by the Council on Tall Buildings and Urban Habitat. The move is part of a deal brokered between the Emanuel Administration and the Landmarks Commission, Curbed reports. The site falls within the boundaries of the Historic Michigan Boulevard District, meaning Jahn's design must respect the size and scale of the existing buildings.

The developer is a JV of JK Equities and Times Equities, which also bought the Lightner Building at 1006 S Michigan in June. [Curbed]

Continue reading this story with a free account

Log in or register
Sign up for more articles like this
Subscribe to Bisnow's Chicago Newsletters
Related Stories

From Pandemic Darling To Cautionary Tale: Pickleball Clubs Face A Reckoning After Betting Big On Retail Space

Morningstar Releases New Details On Over 350K SF In Q3 Office Leases

New Bears Stadium Proposal Floated For Bridgeport

Prologis To Develop 3.8M SF Industrial Park On Former Casino Site

Foundry Robotics Leaves San Francisco For New East Bay HQ

Tenant Rep Firm Expands To Philly, Hires Industry Veteran

$120M Ambulatory Center Planned For Suburbs: The Chicago Deal Sheet

Data Centers Lose The Top Spot, San Francisco Jumps 40 Places: 9 Takeaways From ULI's 2027 Outlook

Obama Center Shows Chicago Is Starved For Development

Mapped: Major Chicago Office Sales Since 2024

Cushman & Wakefield, NYC Added To Suit Alleging $250K Agency Lease Shakedown

Denver Public Schools' $11M Centennial Hall Purchase Marks Rare Land Sale For ULC