Sponsored Content

Off-Site Construction: Myths vs. Realities

Fresno pre-construction Federal Courthouse
Photo credit: Courtesy of Clark Pacific
The Fresno Federal Courthouse Was Built Using Prefabricated Precast.

Building owners, especially owner-occupiers, are increasingly searching for a design and construction process that is more efficient, productive and cost-effective than traditional construction methods as outside factors like the skilled labor shortage, tight schedules and budget overruns are slowing down industry productivity.

Sacramento-based Clark Pacific looks at off-site construction as an approach that fulfills this need while remaining similar to other industry manufacturing processes.

Recent research shows among all stakeholders, the primary reasons for not using prefabricated or off-site construction are that the architect either did not design it into the project (46% of responders) or unfamiliarity with the process (34% of responders). Considering these numbers, a simple lack of understanding may be to blame.

Misconceptions and Realities

Across the board, the main pushback on prefabricated and off-site construction is related to design.

Myth: Prefabricated systems require more decisions.

Reality: Prefabricated systems do not require more decisions, simply that those decisions are made earlier in the process. A commitment to the design work needs to happen at an early stage so the manufacturing lines can be engineered and set up. Early engagement, whether during pre-design or schematic design, is critical to gain the cost benefits of prefabrication.

Myth: Prefabricated systems limit design and are one-dimensional, plain or cannot be aesthetically pleasing or customized to carry out the architect’s vision.

Reality: Prefabricated systems have come a long way and offer high-quality finishes, aesthetic versatility and design flexibility. By working with a prefabricator that has experience collaborating with design teams and making their visions a reality, you can get more aesthetics out of a prefabricated system.

Another primary concern among construction teams remains the quality of build.

Myth: Buildings constructed with prefabricated systems are not created at the same level of quality as traditional buildings.

Reality: This concern shows a lack of education about the realities and benefits of prefabrication since one of the main benefits of off-site construction is the ability to produce higher-quality work under controlled conditions.

Another concern is the costs associated with prefabricated construction.

Myth: Because prefabricated systems require transporting components to the job site, using them is more expensive.

Reality: While there are transportation costs, prefabrication results in shortened construction time, predictable timelines, lower labor costs and more efficient job sites — all of which offset the cost of transportation and can significantly reduce costs over traditional construction methods.

To learn more about this Bisnow content partner, click here.

Continue reading this story with a free account

Log in or register

More About Our Sponsor

| Clark Pacific

Clark Pacific designs, manufactures and builds prefabricated building systems; bridging the gap between construction and manufacturing. Through our design and engineering driven innovation, we offer integrated delivery approaches to deliver high performing and cost effective buildings.Visit www.clarkpacific.com for more information.

Sign up for more articles like this
Subscribe to Bisnow's Los Angeles Newsletters
Related Stories

Camden Property Trust Sells West Coast Portfolio, Clears $1.5B Target

How Long Island Projects Can Cut Through Red Tape And Community Opposition To Cross The Finish Line

Developers Riding The Surf Park Wave With Resorts, Retail And Residences

Oyster Point's Second Phase Half-Leased As Kilroy Navigates Soft Lab Demand

Boca Raton's New Leaders Throwing 'All Kinds Of Curveballs' At Developers

Immigration Crackdowns Dealt LA Businesses A Multimillion‑Dollar Blow

Fined For Rotting Food At Burned LA Cold Storage Warehouse, Lineage Plans To Rebuild

NYC Stops Construction On Another Office-To-Residential Conversion As Inspectors Descend On Job Sites

Rexford Planning Up To $2B In Dispositions This Year

Logos Faith Development Plans 15 Groundbreakings In 3 Years: The Los Angeles Deal Sheet

Culver Commons To Bring New Dining, Retail Options To Bustling Suburban Los Angeles Location

Sony Reopening Hollywood ArcLight, Cinerama Dome Theaters