Bisnow Content Partner:

Crystal City Business Improvement District -

Crystal City Business Improvement District -

https://x.com/crystalcityva crystalcity.org/

703.412.9430

info@crystalcity.org
Sponsored Content

6 Major Transportation Projects That Will Transform Crystal City

Photo credit: Courtesy of the Washington Metropolitan Area Transit Authority
A Bus Along The Expanded Metroway Route

Just outside of Washington, D.C., Crystal City is already well-known for its Class-A mixed-use spaces, reliable transit and accessibility. But the area will soon benefit from additional transportation infrastructure investment, totaling more than $1.5B over the next decade. These investments and plans include road, rail, air and other transit that will redraw the entire region’s accessibility map.

Here are six major transportation projects that will play a significant role in transforming the Crystal City area in the coming years.

1. I-395 Express Lanes Project

Photo credit: Courtesy of Transurban
Interstate 395 in the Greater Washington, D.C., area

When the Interstate 395 Express Lanes Project broke ground last spring, Greater D.C.’s vision for an 81-mile, interconnected regional network of express lanes took another step toward reality. The project adds new road capacity for both personal and transit vehicles and provides an additional toll route to individual drivers. Car pools with three or more people will continue to have access to the lanes at no cost with an E-ZPass Flex set to high occupancy vehicle mode.

Additional improvements will be made to the South Eads Street interchange, providing enhanced mobility for area residents and employees with direct access to Crystal City, Pentagon City and the Pentagon. Construction activities are underway, and drivers can look forward to new I-395 express lanes opening in fall 2019.

2. Second Metrorail Entrance at Crystal City

Photo credit: Courtesy of JBG Smith
The new Crystal Drive entrance to the Crystal City Metro station

As one of the most trafficked stations in Northern Virginia, the sole existing entrance to the Crystal City Metrorail stop often experiences congestion during peak periods. The second entrance at Crystal Drive and 18th Street South would spread the volume of passengers more efficiently along the platform while providing more convenient transfers to the Metrorail from the Virginia Railway Express and the Metroway enhanced, high-frequency bus service.

The new entrance along Crystal Drive would also integrate transit accessibility with Crystal City’s vibrant main street, where much of the current and planned retail activity is concentrated. The new entrance is a key feature of JBG Smith’s proposed Central District Project that includes new retail concepts, an Alamo Drafthouse Cinema and a space for a new public plaza to be designed and built by Arlington County.

3. Project Journey at Ronald Reagan Washington National Airport

Photo credit: Courtesy of the Metropolitan Washington Airports Authority
A rendering of Project Journey at Ronald Reagan Washington National Airport

With Ronald Reagan Washington National Airport located less than 1,000 feet from Crystal City, the business district has access to convenient air travel for visitors, workers and residents. DCA welcomed more than 23 million passengers in 2016, but it was only designed to serve upward of 15 million passengers per year.

To improve the passenger experience, the Metropolitan Washington Airports Authority launched Project Journey. This $1B investment will add a new concourse and transform the post-security environment with relocated security checkpoints. The project is expected to be completed by 2021.

4. Long Bridge Project

Photo credit: Courtesy of the District Department of Transportation
A map of the proposed Long Bridge Project

The replacement and expansion of the Long Bridge railroad crossing of the Potomac River is one of the most important rail projects in the region. The century-old facility serves freight, intercity passenger and VRE trains — and it is close to exceeding capacity. Anticipated increases in freight and passenger traffic along the corridor, including possible Maryland Area Regional Commuter train service and VRE interoperability, require a significant expansion of the bridge’s capacity.

The Long Bridge Project represents a key first step toward replacement. Concepts being evaluated include a new four-track bridge that would double capacity, as well as pedestrian and bicycle connection across the Potomac River. The connection would play a role in linking a growing Crystal City with the revitalized D.C. waterfront.

5. Virginia Railway Express’ Crystal City Station Improvements

Photo credit: Courtesy of Virginia Railway Express
A rendering of VRE's reconfigured connection with the Crystal City Metro station

VRE is currently in the design phase for a reconfigured connection with the Crystal City Metro station that will expand train capacity in one of the busiest stations in the system. While the existing platform is only 400 feet long, VRE trains currently have up to eight cars, which require a 700-foot platform.

The new station, with a longer island platform and access to two tracks, makes future enhancements to regional travel more feasible, like all-day VRE service and connections between MARC and VRE. The project will also enhance local and regional connectivity by better connecting the VRE station to other transit modes, complementing the second Crystal City Metro entrance on Crystal Drive and a future pedestrian connection to the airport.

6. CC2DCA Pedestrian Connection

Photo credit: Courtesy of the Crystal City BID
A rendering of a proposed pedestrian crossing

In February, the Crystal City Business Improvement District released its feasibility study, CC2DCA, exploring the potential for a new pedestrian connection linking Crystal City and Ronald Reagan Washington National Airport with a walk as short as five minutes.

The connection would leverage the investments of other transportation infrastructure projects in the area and present a strong case to attract other services, including an interregional commuter rail, Amtrak regional service and high-speed rail. It would also become a major economic development catalyst for Crystal City, Arlington County and the rest of Virginia.

Arlington's county manager recently included funds in the proposed Capital Improvement Plan, and the Crystal City BID kicked off a follow-up study focused on short-term improvements, both key recommendations of the CC2DCA study.

This feature was produced in collaboration between Bisnow Branded Content and the Crystal City BID. Bisnow news staff was not involved in the production of this content.

Continue reading this story with a free account

Log in or register

Helping Crystal City to realize its potential for businesses, residents, and visitors as the largest walkable downtown in Virginia.

Sign up for more articles like this
Subscribe to Bisnow's Washington, D.C. Newsletters
Related Stories

270-Unit Manassas Gated Community Sells: The D.C. Deal Sheet

BXP Closes In On Next D.C. Office Development As It Shrinks Assets

How Metropolis Is Bringing Parking Into The Future With AI And Recognition Technology

Montgomery County Approves 18-Month Data Center Moratorium

With New $250M Deal, Elme Is Fully Set To Liquidate

Simpson Thacher Appears In Talks For What Could Be One Of D.C.'s Largest Office Leases In 2026

Hines Nabs 4 Prince William Housing Sites: The D.C. Deal Sheet

AvalonBay Sells 217-Unit Community Next To Greensboro Metro

GSA Head Says Federal Government Has 'Place To Play' In Southwest D.C. Redevelopment

Downtown D.C. Office In Receivership Hits Market For Conversion

Nonprofit Takes On $105M Silver Spring Project: The D.C. Deal Sheet

Janeese Lewis George Wants To Stabilize Rent. The Question Is How