The Challenges Of Building An Award-Winning, 347K SF Manufacturing Facility

Photo credit: Courtesy of Peak Construction
Riddell Manufacturing Facility Entrance

The 347K SF Riddell sports equipment manufacturing facility opened this year, and quickly gained recognition as one of Engineering News-Record Midwest’s 2017 Best Projects. Built by Peak Construction and designed by Heitman Architects Inc., the North Ridgeville, Ohio, building was the sole winner in the manufacturing category.

Creating the space for Riddell entailed the design-build construction of a manufacturing and distribution facility capable of handling a large production volume. The North Ridgeville operation encompasses Riddell's football helmet and custom shoulder pad assemblies, plus its full-size collectible football helmets and football gear and apparel product lines.

Photo credit: Courtesy of Peak Construction
Riddell's front lobby

As it relocated and merged critical revenue streams, Riddell needed a team that could optimize the facility for product flow and process efficiency for maximum bottom-line impact. Riddell engaged Peak Construction to serve as part of the evaluation team, which, for six months, weighed a variety of factors that would contribute to the project’s success. These included location, accessibility, site entitlement, regulatory approvals, labor availability, design, zoning considerations and incentive opportunities.

“Once the site was selected, all due diligence, approvals, project permitting, land purchase and closing were strategically coordinated by Peak to adhere to the tight project schedule,” Peak project manager David Michael said. “The project stayed on schedule and was completed in less than nine months, despite many hurdles and obstacles the project team overcame.”

One challenge was managing the emissions generated by Riddell's painting process. The company needed to stay within acceptable emissions levels determined by the Ohio Environmental Protection Agency. To compensate for Riddell’s increased overall product production, Peak installed a large, high-efficiency thermal oxidizer that filters and reduces overall volatile organic compounds.

Photo credit: Courtesy of Peak Construction
Riddell paint room

Peak also had to implement an on-site water reservoir source to provide water pressure and volume. Since there were no adequate public water sources available, this solution was required for the automatic fire sprinkler system.

“The team was further challenged to find a site to provide the building high visibility and a unique brand image,” Peak Construction CEO and founder Michael Sullivan said. “Our architect's solution of creating a full-building-height reflective green glass curtain wall office entry with corresponding signage provided the eye-catching feature to accomplish this objective.”

Despite the large size and manufacturing purpose of the building, Peak and Riddell wanted aesthetically pleasing office features and signage to draw the attention of interstate drivers and passengers. The project also incorporated resource-efficient methods to reduce waste, and adhered to LEED guidelines for sustainability.

Photo credit: Courtesy of Peak Construction
Riddell testing room

“We couldn’t be happier with our recent experience working with Peak Construction on our new 350K SF facility,” Riddell General Manager Benjamin Marker said. “They helped us meet a very aggressive timeline and provided invaluable input regarding complex operations processes along the way. I don’t think any other contractor would have met the expectations or ambitious timelines that were set before them like Peak did.”

Peak was named one of ENR Midwest’s 2017 Top Contractors and one of Midwest Real Estate News’ 2017 Best of the Best Top Construction Companies.

To learn more about this Bisnow content sponsor, click here.

Continue reading this story with a free account

Log in or register

More About Our Sponsor

| Peak Construction

Peak Construction Corporation’s service is more than a commodity. For over 20 years, we’ve been answering the questions you didn’t know to ask, mitigating the risks you didn’t know were there and resolving issues before they become problems. As a full-service Design-Build General Contractor spanning multiple market segments – industrial, office, healthcare, hospitality, construction management, land entitlement/development – we help our clients navigate the big and small decisions that turn their businesses’ needs and goals into solutions that provide immediate results with long term value. Visit peakconstruction.com for more information. Build Value. Design Build.

Sign up for more articles like this
Subscribe to Bisnow's Chicago Newsletters
Related Stories

Mars Factory Overhaul Stalls As Candymaker's Chicago Expansion Accelerates

How Long Island Projects Can Cut Through Red Tape And Community Opposition To Cross The Finish Line

Boca Raton's New Leaders Throwing 'All Kinds Of Curveballs' At Developers

NYC Stops Construction On Another Office-To-Residential Conversion As Inspectors Descend On Job Sites

While Chicago Development Stalls, Fulton Market Keeps Building

AI Has Saved Time But Muddied Traffic Data For CRE Marketing Execs

The Crown Estate Unveils Nearly 170K SF Of West End Redevelopment

AI-Assisted Construction-Bid Startup Fields $4M Seed Investment

Amazon Close To Deal For Goose Island Warehouse: The Chicago Deal Sheet

'A Welcoming Destination': Arlington Heights, Illinois, Is Making Big Investments In Its Future

Oceanwide Plaza Sale Primed To Move Forward

Chicago Ranks No. 3 For AI Job Growth As Office Market Stands To Benefit